Qatar Charity - Water And Wells - Digging Wells

5 Dig Artesian Wells - Taraweeh

Water And Wells / Establishment And Maintenance Of Facilities And Water Structures
Paid Remaining
138,871.00 QAR 1,031,128.00 QAR


5 Dig Artesian Wells - Taraweeh
Country : Mauritania
Drill 5 Artesian Wells With Full Accessories: From A Water Tank Height Of 20:00 And Size Of 20 M 3 And Its Aftermath From A Water Pump And A Source Of Renewable Energy (Solar) And Linked To The Well With A Fully Equipped - (10 180w Panels For One 0.6 Size Batteries 200a, Remote Control In The Shipping And All Other Necessary Equipment ). +. Pipelines To Carry Water From The Well To The Tank .Bina Water Basin Above The Ground Of Concrete For Watering Livestock With A Capacity Of 6 M3.Bina Wall Square Measuring 19 O'Clock × 4 M High 13:00 20 Cm To Protect The Solar Panels And Other Equipment
Country

Mauritania

Beneficiaries Number

0

Implementation Period

12 Periodic

Amount

1,170,000   QAR





Project Description

Drill 5 Artesian Wells With Full Accessories: From A Water Tank Height Of 20:00 And Size Of 20 M 3 And Its Aftermath From A Water Pump And A Source Of Renewable Energy (Solar) And Linked To The Well With A Fully Equipped - (10 180w Panels For One 0.6 Size Batteries 200a, Remote Control In The Shipping And All Other Necessary Equipment ). +. Pipelines To Carry Water From The Well To The Tank .Bina Water Basin Above The Ground Of Concrete For Watering Livestock With A Capacity Of 6 M3.Bina Wall Square Measuring 19 O'Clock × 4 M High 13:00 20 Cm To Protect The Solar Panels And Other Equipment


Project Goals


Project Justifications


Expected Results


Similar Causes